Floor Preparation
The process of floor construction begins with a high quality substrate or slab. This is most commonly made from a single pour of concrete using a concrete transfer pump, alternatively it is poured straight from the concrete mixer.
UFH INSTALLATION
The next step of the floor construction process is laying insulation on the substrate. This should sit evenly and without any movement which is vital to comply with building regulations and to complete the installation to our high standards.
FLOOR SCREEDING
The final step in the process is the installation of levelling or liquid screed. Pro Screed floor screeds are walk-able from only 4 hours and can receive floor coverings from as little as 6 hours after deployment.